# Resource Planner

{{variable.GTX Bold}} enables efficient management of workshop resources using the Business Planner's Resource Planner.

Depending on the system configuration, the Business Planner will usually open on either the **Resource Planner** or Task List.

To access the Resource Planner otherwise, click on the **Resource Planner** tab at the top of the module window.

<ss title="Marlin GTX Resource Planner" alt="Marlin GTX Resource Planner">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-MLN4RL2P.png)</ss>

The Resource Planner contains a grid of time-slots for each resource, to which different bookings and work orders can be added.


## Navigating the Resource Planner
#### Main > Enquiries > Business Planner > Resource Planner

By default, the Resource Planner will show the current day.

Different days can be viewed by clicking on the green arrow buttons at the top of the bookings list to move either backward or forward by a single day.

Alternatively the Calendar in the top-right of the module window can be used to select a specific date.

<ss title="Marlin GTX Resource Planner Calendar" alt="Marlin GTX Resource Planner Calendar">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-PGGHCU5K.png)</ss>

Dates with bookings added to them will be bolded in the calendar, while public holidays are circled in black.

:::(Info) (Note)
Public holiday dates can be set using the Trading Calendar module, which can be accessed by selecting, **System > System Files > Trading Calendar** from the menu bar.
:::

The times shown in the Resource Planner are based on the times set in the **Time Scale Options** tab of the Planner Options window, and can also be adjusted by selecting an option from the **Display Mode** drop-down menu at the top of the Resource Planner window.


<ss title="Marlin GTX Planner Display Mode" alt="Marlin GTX GTX Planner Display Mode">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-TG4I1F5N.png)</ss>


## Adding and Editing Resources
#### Main > Enquiries > Business Planner > Resource Planner

::: (Info) (Note)
In GTX 5.6.1 and onward, Resources can be added and edited using the Resources module, which can be accessed by selecting **System > System Files > Places > Resources** from the menu bar, and will be covered in its own, separate help guide.
:::

In GTX 5.4.3 or earlier, resources can be added and edited by clicking on the **Options** icon at the top of the Business Planner tab and navigating to the Resources tab.

<ss title="Marlin GTX Planner Options Button" alt="Marlin GTX GTX Planner Options Button">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-JN11SAPA.png)</ss>

The **Resources** tab shows a list of existing resources.

<ss title="Marlin GTX Resource Options" alt="Marlin GTX Resource Options">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-GN6OVLC0.png)</ss>

The number of resources shown at once in the Resource Planner window can be changed by editing the **Resources Per Page** textbox to the top-right of the list. To show all resources, enter "0".

Resources can be renamed by editing the relevant line in the list.

To add a resource, increase the number in the **Number of Resources** textbox to the top-left of the resources list.

<ss title="Marlin GTX Resource Addition" alt="Marlin GTX Resource Addition" style="width: 60%;">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-7OHDLHKK.png)</ss>

A new line will appear at the bottom of the list, which can be edited with the name of the new resource.

::: (Warning) (Tip)
Make sure to adjust the number of resources shown per page appropriately, when adding new resources.
:::

::: (Info) (Note)
It is inadvisable to remove resources. If a resource is no longer needed it can be left in the list and hidden from view in the resource planner, or renamed as a new resource, if necessary.
:::
<ss title="Marlin GTX Planner Resource Planner" alt="Marlin GTX GTX Planner Resource Planner">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-BIYTJHZJ.png)</ss>
</ss>



### Viewing Resources
#### Main > Enquiries > Business Planner > Resource Planner

The resources shown in the resource planner can be edited by clicking on the **Visible Resources** drop-down menu at the top of the Resource Planner window and ticking or unticking the desired resources.

<ss title="Marlin GTX Visible Resources" alt="Marlin GTX Visible Resources">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-A0QGX98N.png)</ss>

::: (Info) (Note)
Resources can still be selected on work orders via the **Booking Details** window, even if they are not visible in the planner.
:::

The number of resources shown in the planner window is controlled in the **Resources** tab of the Planner Options window.

If there are more available resources than those shown per page, you will be able to scroll the planner to the right or left to view them.


## Adding Bookings and Orders to the Resource Planner
#### Main > Enquiries > Business Planner > Resource Planner

Default planner items can be added to the Resource Planner by either **double-clicking** on an empty time-slot, or **Right-clicking** on an empty time-slot and selecting **Add an Item**.

<ss title="Marlin GTX Add An Item Option" alt="Marlin GTX Add An Item Option">!![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-H2K4E8I8.png)</ss>

::: (Info) (Note)
The default option when adding an item to the planner can be set to either **Enquiry** or **Booking**. To change the default planner item, {{variable.SupportTeam}}.
:::

Each of the different booking types are covered in more detail, in their own separate help guides.

::: (Info) (Note)
Multiple bookings and orders can be added to the same Resource slot, by adjusting their booking times or dragging them into empty spaces.
:::

### Adding Additional Resources to Bookings
#### Main > Enquiries > Business Planner > Resource Planner

Bookings and Orders can also be assigned to multiple resources by right-clicking on them and selecting **Add Additional Resource**.

<ss title="Marlin GTX Add Additional Resource" alt="Marlin GTX Add Additional Resource">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-QI6EKA5I.png)</ss>

The **Add New Additional Resource** pop-up window will open, containing a form for adding the Resource details.

<ss title="Marlin GTX Add Additional Resource Window" alt="Marlin GTX Add Additional Resource Window">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-VKHG2ZM8.png)</ss>

Once the additional resource is saved the additional booking will appear as an enquiry in the second resource column.

![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-V3IPUOJA.png){height="" width=""}



### Adding Unassigned Work Orders to the Resource Planner
#### Main > Enquiries > Business Planner > Resource Planner

Unassigned **Work Orders** are listed on the right of the Resource Planner and can be added to a booking slot by dragging and dropping them into the desired time-slots.

<ss title="Marlin GTX Work Orders List" alt="Marlin GTX Work Orders List">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-6GGVCLF7.png)</ss>

Existing Quotes can also be viewed from within the Resource Planner, by clicking on the **Open Quotes** heading above.

<ss title="Marlin GTX Quotes List" alt="Marlin GTX Quotes List">![image.png](https://cdn.document360.io/d7282b31-60c4-41e6-bf87-3f684d4da049/Images/Documentation/image-GS6J81JR.png)</ss>

Quotes cannot be dragged into booking slots, but can be double-clicked and converted to Work Orders (and then assigned a time slot), as usual.

::: (Info) (Note)
The number of days Open quotes are kept for can be edited in the **Quotes & Unassigned Work Orders** tab of the Planner Options window.
:::